Below is a list of ongoing and completed projects;
CLIENT: Shell Petroleum Development Company
LOCATION: Forcados CLP
STATUS: Ongoing
SCOPE SUMMARY: Flowline repair and associated works.
CLIENT: Nigerian Agip Oil Company Limited
LOCATION: Olugbobiri
STATUS: Ongoing
SCOPE SUMMARY: Repair and replacement of damaged pipelines and flowlines in Swamp Operational Area (SAR). Immediate intervention/repair of damage(s) to pipeline and flowline facilities within the Swamp Operational Area to minimize production losses and lessen adverse effect of pollution on the environment. Service oriented and include mobilization and transportation of material and personnel to site, isolation of affected facility, repair/replacement of the damage section or point, testing of the repaired point (NDT) and pressure testing of the replaced section (where necessary).
CLIENT: Desicon Engineering
LOCATION: NLNG Complex, Bonny Island
STATUS: Ongoing
SCOPE SUMMARY: Drinking water tank and demineralized water tank erection with all related accessories, access ladder, handrails, and roof structures etc.
CLIENT: Heritage Energy Operational Services Limited
LOCATION: Batan, Delta
STATUS: Completed
SCOPE SUMMARY: Recovery of spilled hydrocarbon and transloading into environmental barge.
Load More Projects